
EV charger installation
EV Charger Installation in Orange County
Level 2 home chargers installed by licensed electricians, with a load check first so your panel can handle it.
- Since 1991
- C-10 #1049948
- Licensed & insured
EV charger installation
Start with the panel, not the charger
A Level 2 charger usually needs a dedicated 40 to 60 amp circuit. Before we install one, we do a load calculation on your service to see whether the panel has the capacity.
Many homes do. Some need a panel upgrade or a load management device, and some older panels, like Federal Pacific or Zinsco, should be replaced first. We tell you which applies to your home before you buy anything.
An EV install includes
- Load calculation on your existing service
- Dedicated circuit and breaker
- Charger mounting and connection, hardwired or 240V outlet
- Permit and inspection
- Panel upgrade options if needed
Cost
Panel and EV charger together
When a charger needs a panel upgrade, most Orange County homeowners pay between $3,000 and $5,500 for the panel and charger preparation together.
Every home is different. Actual pricing depends on panel age, circuit count, stucco or siding repair, permit requirements, overhead or underground service, and site conditions. A free inspection gives you an accurate quote for your home.
Chargers
Which charger?
If you have not bought a charger yet, we can help you choose one that fits your car, your parking spot and your panel.
Related
You may also need
FAQ
Common questions
Can I plug my EV into a regular outlet?
Yes, but a standard 120V outlet charges very slowly. A Level 2 charger is usually the practical choice for daily driving.
Do I need a 200 amp panel for an EV charger?
Not always. A load calculation tells us whether your current service can handle it.
Free, no obligation
Schedule your free panel inspection
A licensed Tradesman electrician will look at your panel, explain what they find in plain language, and tell you honestly whether it needs replacing, repairing, or nothing at all.
