Serving Orange County since 1991Licensed & insuredC-10 License #1049948
Free panel inspections · (949) 528-4776
New 200 amp electrical panel

100 to 200 amp upgrade

100 to 200 Amp Panel Upgrade in Orange County

More capacity for air conditioning, modern kitchens, heat pumps, EV chargers and solar, with the permit and utility work handled for you.

  • Since 1991
  • C-10 #1049948
  • Licensed & insured

100 to 200 amp upgrade

Does your home need 200 amps?

Many Orange County homes built before the 1980s have a 100 amp service, and some still have 60. That was plenty when the house was built. Central air, an induction range, a heat pump water heater, a pool pump and an EV charger running together can be more than a 100 amp service can safely carry.

A 200 amp upgrade replaces the panel and the service equipment so the house has room to grow. It is also the point where we bring grounding and bonding up to current code.

Not every home needs it. If your house is modest in size, runs on gas and has no plans for an EV or solar, a same-amperage replacement may be the better value. We will tell you which one fits.

An upgrade usually includes

  • New 200 amp panel and main breaker
  • New meter socket and service equipment where required
  • Utility coordination with SCE, SDG&E or Anaheim Public Utilities
  • Grounding and bonding to current code
  • City permit and final inspection
  • Every circuit traced, labeled and balanced

Cost

What a 200 amp upgrade costs

Type of workTypical Orange County range
100 to 200 amp main panel upgrade$3,000 to $5,500+
City permit (on average, depending on scope of work and project size)$50 to $250+
Stucco patch, if needed (paint extra)$600 to $850 on average

Every home is different. Actual pricing depends on panel age, circuit count, stucco or siding repair, permit requirements, overhead or underground service, and site conditions. A free inspection gives you an accurate quote for your home.

Timeline

How long it takes

The work on site is usually one day. The utility side is what sets the schedule: Southern California Edison typically takes around 90 days to approve and schedule a service upgrade, and SDG&E can take three to six months. We submit the paperwork early and keep you posted.

Overhead services cost a little more than underground ones, because the riser, weather head and wires are replaced too.

Related

You may also need

EV charger installation

Level 2 chargers and the circuits to run them.

Learn more

Subpanel installation

Extra circuits for a garage, ADU or addition.

Learn more

Panel replacement cost

Typical Orange County ranges, explained.

Learn more

FAQ

Common questions

Will I need a new meter?

Often, yes. A 200 amp service usually needs a new meter socket, which we install and the utility sets the meter in.

Can I upgrade for an EV charger only?

Sometimes a load calculation shows your existing panel can support a charger. We check that first, so you do not upgrade when you do not need to.

Do I have to be home?

Someone needs to let us in and be reachable. Many customers go to work and come back to a finished panel with the power on.

Free, no obligation

Schedule your free panel inspection

A licensed Tradesman electrician will look at your panel, explain what they find in plain language, and tell you honestly whether it needs replacing, repairing, or nothing at all.