
Unsafe electrical panels
Federal Pacific Panel Replacement in Orange County
Federal Pacific Stab-Lok panels were installed in millions of homes built from the 1950s to the 1980s. Here is what has been documented about them, and what replacing one involves.
How to identify it
Do you have a Federal Pacific panel?
- “Federal Pacific Electric” or “FPE” on the door or the inside label
- Breakers marked “Stab-Lok”
- Thin breakers, often with red or orange tips
- Breakers that flip toward the outside of the panel when on
- A home built roughly between 1950 and 1990

The concerns
What has been documented
Federal Pacific Electric made Stab-Lok panels and breakers from about 1950 to 1980, and they were installed in homes across the country, including many Orange County tracts.
Independent testing by Dr. Jesse Aronstein, P.E., documented breaker failure rates of 60 to 70 percent in some tests, meaning breakers that did not trip when they should have. A breaker that does not trip cannot protect the wiring behind it.
The CPSC investigated and found significant safety concerns. FPE’s UL listing was revoked after fraudulent test data came to light, and in 2002 a New Jersey court found that FPE knowingly distributed circuit breakers that had not been tested to UL standards. Class-action lawsuits documented fire incidents.
None of this means a given panel will fail tomorrow. It means the breakers cannot be relied on to do their one job, which is why we recommend replacement rather than repair.
Insurance
What it means for your coverage
Many insurance companies will not write or renew a homeowners policy on a home with a Federal Pacific panel. Replacing it, with a permit and photo documentation, gives your insurer what it asks for.
Replacement
What replacing it involves
Most Orange County homeowners pay between $3,000 and $5,500 to replace a Federal Pacific panel with a modern panel of the same amperage, or to upgrade to 200 amps at the same time.
Every home is different. Actual pricing depends on panel age, circuit count, stucco or siding repair, permit requirements, overhead or underground service, and site conditions. A free inspection gives you an accurate quote for your home.
Process
How we replace it
Free inspection
A licensed electrician checks your panel, service and grounding, then explains what they found. If a repair is enough, we say so.
Clear written quote
You get one price for the full scope: panel, permit, utility coordination and any stucco or siding patch. No surprises later.
Permits and utility
We pull the city permit and coordinate the disconnect and reconnect with SCE, SDG&E or Anaheim Public Utilities.
Same-day power
Most replacements are finished between 8am and 5pm, with every circuit traced, labeled and balanced, so you sleep with power on.
FAQ
Federal Pacific panel questions
Can I replace just the Stab-Lok breakers?
Replacement breakers exist, but they do not address the panel itself, and the concerns involve both. Replacing the panel is the reliable fix.
How long does a Federal Pacific replacement take?
Usually one working day, with power back on before the crew leaves.
Will you take the old panel?
Yes. We remove and dispose of the old panel and breakers.
Free, no obligation
Schedule your free panel inspection
A licensed Tradesman electrician will look at your panel, explain what they find in plain language, and tell you honestly whether it needs replacing, repairing, or nothing at all.
