
Unsafe electrical panels
Pushmatic and Bulldog Panel Replacement in Orange County
Pushmatic panels, made by Bulldog Electric and later ITE, used push buttons instead of toggle breakers. They are now well past their design life, and parts are hard to find.
How to identify it
Do you have a Pushmatic panel?
- Push buttons instead of toggle switches
- A Bulldog logo embossed on the panel, or “Pushmatic” or “ITE” labels
- No single main breaker on many models
- A 60 or 100 amp service
- A home built roughly between 1950 and 1970

The concerns
What has been documented
Pushmatic breakers use a push-button mechanism with a thermal trip only, without the magnetic trip that modern breakers add. As the internal lubricant dries out, the mechanism can stiffen and stick.
A stuck breaker can show “off” while still conducting internally, and a stiff breaker may not trip as quickly as it should.
Replacement breakers are no longer manufactured, and the ones that turn up are old stock or salvaged. These panels also cannot accept the AFCI and GFCI protection current code expects.
Most Pushmatic panels are rated for only 60 to 100 amps, so replacement is usually paired with an upgrade to 200 amps.
Insurance
What it means for your coverage
Insurers are increasingly flagging Pushmatic panels because of their age and obsolescence. A permitted replacement settles the question and usually adds capacity at the same time.
Replacement
What replacing it involves
Pushmatic replacements usually include a service upgrade. Most Orange County homeowners pay between $3,000 and $5,500 for a 100 to 200 amp upgrade.
Every home is different. Actual pricing depends on panel age, circuit count, stucco or siding repair, permit requirements, overhead or underground service, and site conditions. A free inspection gives you an accurate quote for your home.
Process
How we replace it
Free inspection
A licensed electrician checks your panel, service and grounding, then explains what they found. If a repair is enough, we say so.
Clear written quote
You get one price for the full scope: panel, permit, utility coordination and any stucco or siding patch. No surprises later.
Permits and utility
We pull the city permit and coordinate the disconnect and reconnect with SCE, SDG&E or Anaheim Public Utilities.
Same-day power
Most replacements are finished between 8am and 5pm, with every circuit traced, labeled and balanced, so you sleep with power on.
FAQ
Pushmatic panel questions
Is a Pushmatic panel dangerous?
It is obsolete rather than notorious. The concerns are stiff mechanisms, thermal-only trips, missing main breakers and unavailable parts, all of which point to replacement.
Can I add circuits to a Pushmatic panel?
Usually not practically. New breakers are not made, and the panel cannot take AFCI or GFCI protection.
Do I have to upgrade to 200 amps?
Not always, but with a 60 or 100 amp Pushmatic service it is often the sensible time to do it.
Free, no obligation
Schedule your free panel inspection
A licensed Tradesman electrician will look at your panel, explain what they find in plain language, and tell you honestly whether it needs replacing, repairing, or nothing at all.
