Serving Orange County since 1991Licensed & insuredC-10 License #1049948
Free panel inspections · (949) 528-4776
Pushmatic panel with push-button breakers

Unsafe electrical panels

Pushmatic and Bulldog Panel Replacement in Orange County

Pushmatic panels, made by Bulldog Electric and later ITE, used push buttons instead of toggle breakers. They are now well past their design life, and parts are hard to find.

How to identify it

Do you have a Pushmatic panel?

  • Push buttons instead of toggle switches
  • A Bulldog logo embossed on the panel, or “Pushmatic” or “ITE” labels
  • No single main breaker on many models
  • A 60 or 100 amp service
  • A home built roughly between 1950 and 1970
Pushmatic panel with push-button breakers
A Pushmatic panel. Photos of your own panel are the fastest way to confirm.

The concerns

What has been documented

Pushmatic breakers use a push-button mechanism with a thermal trip only, without the magnetic trip that modern breakers add. As the internal lubricant dries out, the mechanism can stiffen and stick.

A stuck breaker can show “off” while still conducting internally, and a stiff breaker may not trip as quickly as it should.

Replacement breakers are no longer manufactured, and the ones that turn up are old stock or salvaged. These panels also cannot accept the AFCI and GFCI protection current code expects.

Most Pushmatic panels are rated for only 60 to 100 amps, so replacement is usually paired with an upgrade to 200 amps.

Insurance

What it means for your coverage

Insurers are increasingly flagging Pushmatic panels because of their age and obsolescence. A permitted replacement settles the question and usually adds capacity at the same time.

Replacement

What replacing it involves

Pushmatic replacements usually include a service upgrade. Most Orange County homeowners pay between $3,000 and $5,500 for a 100 to 200 amp upgrade.

Every home is different. Actual pricing depends on panel age, circuit count, stucco or siding repair, permit requirements, overhead or underground service, and site conditions. A free inspection gives you an accurate quote for your home.

Process

How we replace it

Free inspection

A licensed electrician checks your panel, service and grounding, then explains what they found. If a repair is enough, we say so.

Clear written quote

You get one price for the full scope: panel, permit, utility coordination and any stucco or siding patch. No surprises later.

Permits and utility

We pull the city permit and coordinate the disconnect and reconnect with SCE, SDG&E or Anaheim Public Utilities.

Same-day power

Most replacements are finished between 8am and 5pm, with every circuit traced, labeled and balanced, so you sleep with power on.

FAQ

Pushmatic panel questions

Is a Pushmatic panel dangerous?

It is obsolete rather than notorious. The concerns are stiff mechanisms, thermal-only trips, missing main breakers and unavailable parts, all of which point to replacement.

Can I add circuits to a Pushmatic panel?

Usually not practically. New breakers are not made, and the panel cannot take AFCI or GFCI protection.

Do I have to upgrade to 200 amps?

Not always, but with a 60 or 100 amp Pushmatic service it is often the sensible time to do it.

Free, no obligation

Schedule your free panel inspection

A licensed Tradesman electrician will look at your panel, explain what they find in plain language, and tell you honestly whether it needs replacing, repairing, or nothing at all.